BIM application of rigid-frame continuous beam arch bridge in Shenzhen Metro Line 6 Project
Long span bridge between Heshuikou and Shutianpu of Shenzhen Metro Line 6 Project, the main span length is about 150m and the curve radius is 550m. Using BIM modeling analysis, construction simulation, collision detection, TWO-DIMENSIONAL code results submission and other means to solve the technical problems in bridge construction.
Integrated design and construction of the whole bridge 3d modeling (accuracy: L0D300) The main construction steps of the whole bridge are simulated Local complex node construction simulation Critical node collision detection and adjustment scheme Application of BIM technical achievements based on two-dimensional code