Guangzhou Metro Line 13 Phase II
The second phase of Guangzhou Metro Line 13 has a length of 33.8km and adopts the 6m diameter conventional shield or open-cut construction method. Some stations are designed with column-free structure.
Preliminary design and final design of four stations and four sections from Chaoyang to Xizhou (excluding).
BIM work of civil engineering and mechanical and electrical engineering in six sections of seven stations from Chaoyang to Luochong Wai, including: construction of professional model of civil engineering and electrical engineering; Collision detection and handling suggestions among different specialties; Make construction drawing according to progress; Professional calculation report and difference report with drawing material sheet; Construction schedule analysis and simulation and project visual management; Animation, roaming; VR Virtual reality.