Bang Na Expressway Viaduct, Thailand
The total length of the project is 55km and the total investment is usd 4 billion. The whole bridge adopts modern industrial precast technology to realize the construction without interference to traffic and environment. The construction lasted 48 months.
Dr. Sun Junling is the viaduct designer of the project