Guangzhou Metro Line 11 Chisha Metro depot
Ministry of Housing and Urban-Rural Development "Technology Demonstration Project"
Covers an area of 34.65 hectares of double depot, underground 135,000 square meters, ground upper 160,000 square meters, prefabricated area of more than 50%.
The first half-buried double-storey prefabricated subway depot with a supertall building
Prestressed structural system is introduced for the first time
Modern industrial bridge construction method was applied for the first time
Prefabrication design and construction of core technology consulting